Carport canopies add structural, drainage and parking-lot lease questions on top of the standard solar checklist.
Missing something? That's normal.
Legacy projects rarely have complete records. Everything you can find speeds up due diligence, but nothing on this list disqualifies a project. We work with what you have and retrieve the rest ourselves.
- Sections
- 8 sections
- Items
- 81 items
- Key items
- 8 key items
Carport checklist
Grouped by section. Open a section to see each item and why we ask for it.
Project & Site Information
Basic details about your project's location, size, and production history.
- ●Project address and GPS coordinates
Exact site location for title, zoning, and interconnection verification.
- ●System size — DC kW and AC kW
We acquire projects 250 kW-DC and above. Please confirm both DC and AC nameplate ratings.
- ●Year installed / commissioned date
Establishes ITC eligibility period and remaining useful life of components.
- ●Historical production data (last 3–5 years)
Monthly or annual kWh output from monitoring system or utility bills. Critical for valuation.
- ●Utility account number and rate class
Identifies the applicable net metering tariff, time-of-use rates, and billing history.
- ●As-built / site layout drawings
The actual installed configuration — not just design drawings. Required for technical review.
- ●Aerial or site photographs
Recent photos of the array, inverters, racking, and overall site conditions.
- ●Parking structure / canopy engineering drawings
Structural drawings for the carport canopy — not just the solar array. Required to assess structural integrity and load capacity.
- ●Number of parking spaces and layout
Confirms site footprint and any ADA or zoning compliance requirements for covered parking.
Permitting & Regulatory Status
Active permit status is one of our primary acquisition risk areas. Many jurisdictions have abandonment clauses — systems inactive for 12+ months can have their permits revoked. We need to verify all permits are current.
- ●Operating permit / Permission to Operate (PTO) — current status⚠ Key item
The utility-issued PTO authorizing the system to energize and export power. Confirm it remains active and has no expiration or renewal conditions attached.
- ●Municipal building permit — final inspection sign-off⚠ Key item
Confirms the system passed AHJ inspection. Should show 'closed' or 'finaled' status — not just 'issued.' An open permit is a red flag.
- ●Electrical permit — final sign-off
Separate from the building permit in most jurisdictions. Confirm final inspection was completed.
- ●Special Use Permit or Conditional Use Permit — if applicable⚠ Key itemGround Mount
Required for many projects, particularly ground mounts. Confirm current status, any renewal deadlines, annual compliance conditions attached, and the specific abandonment clause language.
- ●Zoning variance or Board approval records
If a hearing was required, include meeting minutes, the approval resolution, and any conditions of approval.
- ●Decommissioning plan and financial surety bond⚠ Key itemGround Mount
Many municipalities require a bonded decommissioning plan as a condition of land use approval. This liability transfers with ownership — we need the bonding amount, bond holder, and renewal date.
- ●Abandonment clause language from local ordinance or permit⚠ Key item
Most municipalities define abandonment as 12 consecutive months without energy generation. Provide the specific clause language and confirm the project is not at risk of triggering it.
- ●Environmental permits — wetlands, stormwater, NJDEP, NYSDEC, MA DEP, etc.
Required if construction disturbed wetlands or triggered stormwater management review. Include any ongoing compliance conditions.
- ●Compliance certificates or periodic inspection reports
Annual or periodic inspections required by permit conditions. Include the most recent report.
- ●Structural building permit for carport canopy⚠ Key item
The canopy itself requires a separate structural permit in most jurisdictions — distinct from the electrical/solar permit.
Legal & Contracts
Agreements that define ownership, site rights, and ongoing obligations.
- ●Proof of ownership — title, bill of sale, or purchase agreement
Establishes clean title to the system. If ownership has changed hands, include all prior transfer documents.
- ●Interconnection agreement with utility
The signed agreement — separate from the PTO. Defines export limits, standby charges, and any upgrade obligations.
- ●Site lease or license agreement
The agreement granting rights to use the roof, land, or parking structure. We review term length, rent escalators, assignment rights, and default provisions.
- ●Power Purchase Agreement (PPA) — if applicable
Full PPA with rate, escalator, remaining term, and change-of-control / assignment provisions.
- ●Net metering agreement and credit history
The specific grandfathered tariff rate. Net metering rates vary significantly by state and vintage — this is a key value driver.
- ●Community solar / CDG subscriber agreements — if applicableNY
Subscriber list, contract terms, churn rate, and billing administrator contact.
- ●Easements, rights of way, or access agreements
Any third-party rights affecting the site, including ingress/egress easements.
- ●O&M service contracts
Current maintenance provider agreement — scope, pricing, and termination provisions.
- ●Prior sale or assignment agreements
If ownership has changed hands, include all prior transfer documents and any representations or warranties made at prior closings.
- ●SNDAs (Subordination, Non-Disturbance, and Attornment agreements)
Required if there is a mortgage on the host property. Confirms solar rights survive a foreclosure — often required by lenders.
- ●Parking lot lease or easement — if on third-party property
Carport structures often sit on leased lots. Confirm the lease covers the canopy structure, not just equipment access.
- ●Landlord consent to canopy construction
Written landlord consent should be on file if the structure was built on leased land.
Financial Records
Documentation of revenue, incentive enrollment, costs, and encumbrances.
- ●Recent utility bills or revenue statements (12–24 months)
Shows actual generation revenue, net metering credits, or PPA payments received.
- ●SREC / REC account credentials and registry enrollment
The PJM-GATS, NEPOOL-GIS, or other registry account where certificates are issued. Account transfer is required at closing.
- ●Incentive enrollment documentation
Enrollment letter, NJ State Certification Number, MA SMART Statement of Qualification, NY-Sun incentive agreement, or VT CPG — confirming program participation and remaining term.
- ●Historical SREC / REC sale records
Contracts, settlement statements, or brokerage records showing historical incentive revenue.
- ●Grandfathered incentive approval letters
Any legacy program enrollments (e.g., NJ SREC-I, CT ZREC/LREC) with confirmed grandfathered rates and remaining term.
- ●ITC documentation — even for 6+ year old systems⚠ Key item
We still want to see original ITC certification, basis documentation, and confirmation that the 5-year recapture period has closed. If tax equity was used, provide the partnership flip or lease pass-through documents.
- ●Outstanding loans, liens, or UCC-1 filings on the system
A lien search confirming whether any lender has a security interest in the equipment. Must be resolved or assumed at closing.
- ●Property tax assessment and solar tax treatment
Several states offer solar property tax exemptions. Confirm current treatment and any PILOT agreements with municipalities.
- ●Historical financial performance (P&L if available)
Revenue, O&M costs, insurance premiums, and any capital expenditures over the system's life.
Equipment & Technical
Component specifications, condition, warranties, and monitoring access.
- ●Equipment specifications — panel make, model, wattage
Manufacturer, model number, and wattage per panel. Tier-1 vs. non-Tier-1 status affects valuation.
- ●Inverter make, model, and type
String, central, or microinverter configuration. Age, firmware version, and any prior failure history.
- ●As-built drawings and single-line diagram
Final installed configuration including single-line diagram, panel layout, and interconnection point.
- ●Component warranty documentation
Panel, inverter, and racking warranties — and confirmation that each warranty is transferable to a new owner.
- ●Monitoring platform access / login credentials
Platform name (SolarEdge, Enphase, PowerDash, etc.), account login, and whether the subscription is current.
- ●Monitoring reports or performance data exports
At minimum 12 months of production data by month. Ideally exported directly from the monitoring platform.
- ●Maintenance logs and repair history
Any inverter replacements, panel swaps, racking repairs, or electrical issues.
- ●Transformer or substation documentation — if applicable
Ownership, maintenance history, and any upgrade obligations with the utility.
- ●Independent Engineer (IE) report — if one exists
If a prior lender or owner commissioned an IE report, this significantly accelerates our technical review.
- ●Structural inspection report for canopy
A licensed structural engineer's assessment of canopy condition — especially important for systems 7+ years old.
- ●Drainage and stormwater documentation
Canopy structures affect stormwater runoff. Include any drainage permits or engineered drainage solutions.
- ●EV charging integration documentation — if applicable
If EV chargers are integrated with the carport, include make/model, utility agreement, and any EV revenue records.
Operations & Maintenance
Records of how the system has been managed and maintained.
- ●O&M service agreements
Current provider, scope of work, pricing, and remaining term.
- ●Maintenance logs and repair records
All service visits, corrective repairs, and component replacements.
- ●Historical downtime or curtailment events
Any periods of reduced or zero output and the documented cause.
- ●Insurance certificates — current policy
General liability and property coverage. Named insured, policy limits, and any claims history.
- ●Emergency response / first responder information
Some utilities require a site-specific emergency plan on file. Provide if available.
- ●Incident log
Any fire events, theft, vandalism, or significant damage incidents.
Contact Information
Key parties involved with your project.
- ●Property owner / lessor contact
Name, phone, email. If different from the seller.
- ●PPA off-taker contact — if applicable
The entity purchasing the power or credits under the PPA.
- ●Utility company contact and account rep
Name and contact at the utility for interconnection and billing questions.
- ●O&M provider contact
Current maintenance company and primary contact.
- ●Original EPC / installer contact
If known — helpful for locating original design documentation.
- ●Legal counsel
Attorney who handled the original project financing or any prior sale.
State-Specific Incentive & Program Documents
Provide what applies to your project's location. State-specific program documentation is often the most time-consuming to locate — start here early.
- ●NY — NY-Sun incentive agreement and payment scheduleNY
NYSERDA NY-Sun incentive agreement, payment milestones, and any remaining clawback provisions.
- ●NY — CESIR interconnection study (required for systems >50 kW-AC)NY
Con Ed, National Grid, PSEG-LI, or other utility Coordinated Electric System Interconnection Review. Confirms interconnection capacity and any upgrade obligations.
- ●NY — Community DG (CDG) program documentation and subscriber listNY
Subscriber agreements, billing administrator contact, and VDER payment records for community distributed generation projects.
- ●NJ — NJCEP State Certification NumberNJ
NJ BPU-issued certification number required for SREC/SuSI eligibility. Confirms program enrollment and incentive term.
- ●NJ — SuSI / SREC-II enrollment letter and GATS account credentialsNJ
Successor Solar Incentive program enrollment letter and PJM-GATS account — must be transferred at closing for SRECs to continue accruing.
- ●NJ — NJBPU PTO and EDC interconnection approvalNJ
NJ BPU Permission to Operate and Electric Distribution Company (EDC) interconnection approval letter.
- ●MD — MEA SREC registration and GATS accountMD
Maryland Energy Administration SREC registration and account in the PJM-GATS tracking system.
- ●MD — PSC review documentation — for projects >2 MWMD
Maryland Public Service Commission review documentation required for larger commercial and utility-scale projects.
- ●MA — SMART Program Statement of Qualification (SOQ)MA
Dept. of Public Utilities-approved SOQ confirming SMART incentive rate, term, and any adder eligibility (brownfield, low-income, canopy, etc.).
- ●MA — DOER Class I REC registration in NEPOOL-GISMA
MA Dept. of Energy Resources renewable energy registration and NEPOOL Generation Information System account.
- ●MA — Special Permit under Chapter 40A — for large ground mountsMA
Municipal special permit required for large-scale ground-mounted systems. Include all conditions and any required decommissioning surety bond.
- ●PA — SREC registration in PJM-GATSPA
Pennsylvania SREC registration and PJM-GATS account for REC tracking and transfer.
- ●PA — Act 129 / AEPS compliance documentation — if applicablePA
For projects participating in Pennsylvania's Alternative Energy Portfolio Standard.
- ●DC — DCSEU or DOEE incentive documentationDC
DC Sustainable Energy Utility or Dept. of Energy and Environment program enrollment and incentive agreement.
- ●DC — SREC-II registration and accountDC
DC's SREC market requires separate registration. Confirm account status and the process for transfer.
- ●VT — Certificate of Public Good (CPG)⚠ Key itemVT
Vermont Public Utility Commission Certificate of Public Good — the primary operating authorization for Vermont solar projects. Confirm it is active, current, and has no lapsed conditions.
- ●VT — Standard Offer or net metering agreementVT
VT Standard Offer contract or net metering tariff agreement with Green Mountain Power or other Vermont utility.
Different project type?
Not sure what applies to you?
Reach out and we'll tell you which of these actually matter for your project and state.