Massachusetts projects earn SREC IIs for 10 years at most, then earn Class I RECs worth far less. How to find your end date and today's SREC II price.
Yes. A Massachusetts solar project earns SREC IIs for no more than 40 quarters, or 10 years, and after that it earns Class I RECs instead. Most commercial projects were built around 20-year contracts, so the SREC IIs run out about halfway through. As of November 2026, a 2026 SREC II was going for about $222 and a Class I REC for about $38, so most of the certificate income ends with the term. Find your project's end date now, and work out what the project looks like without that income.
For many owners, the first sign that the SREC IIs are ending is an email. Each quarter, the state's Department of Energy Resources (DOER) emails a transition notice to the account holder of every project whose SREC II term is up, asking them to confirm the project's account so it can start earning Class I RECs. If that inbox belonged to the installer, or to someone who left years ago, nobody answers. The project loses that quarter's Class I RECs, and the state says it won't make them up later, but the project can still make the switch in the next quarter.
Massachusetts Had Two SREC Programs
SREC I is over. Most commercial projects built from 2014 to 2018 are in SREC II.
- ●SREC I (the Solar Carve-out). Covers projects the state qualified from January 2010 to April 2014, about 650 MW of solar in all. They earned SRECs through 2023 and now earn Class I RECs.
- ●SREC II (the Solar Carve-out II). Covers projects the state qualified from April 2014, when SREC I filled up, until the SMART program replaced it on November 26, 2018. A project couldn't start earning SREC IIs until the utility gave it permission to operate.
The two programs work the same basic way. The differences:
- ●When they took projects: SREC I from 2010 to 2014, SREC II from 2014 to 2018.
- ●Prices: each has its own price schedule, with SREC II's ceiling and auction prices set lower.
- ●How many certificates a project earns: under SREC I, one SREC for every 1,000 kWh. SREC II added an SREC factor, which can cut that number (more on that below).
To check which program your project is in, look for its Statement of Qualification from DOER and its account in the Production Tracking System, where production is reported each month. DOER also publishes a list of qualified projects that shows the last quarter each one can earn SRECs.
SREC IIs Last 40 Quarters, Then Become Class I RECs
The clock is the project's "Opt-in Term," set when the state qualified it.
A quarter is a calendar quarter, three months: January to March, April to June, July to September, or October to December. So 40 quarters is 10 years. Massachusetts also counts SRECs by calendar year, January to December, so a 2026 SREC II is one made from power produced in 2026.
A project that started earning SREC IIs in the third quarter of 2016 (July to September) earns them through the second quarter of 2026 (April to June). A project that came online in 2014 is already earning Class I RECs, and since the last SREC II projects came online in late 2018, the last terms run out around the end of 2028.
Moving from SREC IIs to Class I RECs isn't automatic. Answer DOER's transition email before the deadline. If you never got one, look your project up on the state's list of qualified projects to see its last SREC quarter, update the contact email in the Production Tracking System, and write to DOER at doer.srec@mass.gov.
What a Class I REC Is
A certificate that wind, hydro and other renewable projects earn too, which is why it's worth so much less.
Massachusetts requires electricity suppliers to buy a share of their power from renewable projects that started running after 1997. That's the state's Class I requirement, and a Class I REC (renewable energy certificate) stands for 1,000 kWh from one of those projects. Solar qualifies, but so do wind farms, small hydro, landfill gas and others. SRECs were a solar-only slice of that requirement, which kept their price high. Class I RECs compete with every other kind of renewable power, so they sell for a fraction of the price.
How Much Income Ends With the Term
On a 500 kW project, about $110,000 a year.
Say a 500 kW project makes 1,200 kWh for every kW a year, close to the state's average for SREC projects. That's 600,000 kWh a year.
- ●During the term: 600,000 kWh / 1,000 = 600 SREC IIs. At $222, that's $133,200 a year.
- ●After the term: the same 600,000 kWh earns 600 Class I RECs. At $38, under 4 cents a kWh, that's $22,800 a year.
That's about $110,000 a year gone, before any fees, while insurance and repairs cost what they did.
One catch: many SREC II projects earn fewer than one SREC II per 1,000 kWh. Their SREC factor, a number from 0.5 to 1.0 that DOER set based on the type of project, when it connected and whether it got an extension, cuts the count. It's on your Statement of Qualification. The factor only applies to SREC IIs: after the term, the project earns a full Class I REC for every 1,000 kWh. With a factor of 0.8, the same project earns 480 SREC IIs, worth $106,560, so the drop to $22,800 is about $84,000 a year.
What an SREC II Is Worth Today
About $222 for a 2026 SREC II as of November 2026, between a state ceiling of $232 and a floor of $171.
Electricity suppliers in Massachusetts have to cover a share of their sales with SREC IIs. If they fall short, they pay the Alternative Compliance Payment instead, which caps what a buyer should pay: $232 per SREC II for 2026 and $220 for 2027.
The floor is the state's own auction, held each summer for SREC IIs that didn't sell. 2026 SREC IIs sell there for $180, and the owner gets $171 after the state's 5% fee. For 2027, it's $171, or $162.45 to the owner. The most recent auction, for 2025 SREC IIs, sold out in its first round on July 29, 2026.
The share suppliers have to buy is shrinking as projects age out: 2.31% of sales in 2026, and 1.23% for 2027 on most contracts.
Sell Them Yourself Before You Pay Someone To
Report every month, find buyers directly if you can, and use an aggregator or broker if you can't.
- Report production on time. Production goes into the Production Tracking System every month, in a window from the last five days of the month to the first five days of the next. Projects over 10 kW have to report automatically through a data system. A missed report can cost the SRECs for that period.
- Find buyers directly. Any owner can open an account on NEPOOL GIS, the regional certificate tracking system, and sell SREC IIs straight to buyers. That saves the fees, but it takes someone to find buyers and keep an eye on prices.
- Or join an aggregation. An aggregator sells for many projects at once, for a fee. The state publishes lists of aggregators and brokers, doesn't recommend any of them, and tells owners to look hard at the contract terms and fees.
- Use the auction as a backstop. SREC IIs that haven't sold can go into the state's auction between May 16 and June 15 each year.
Repairs Don't Have to Cost You SRECs
Replace broken panels with the same capacity, and tell the state within 30 days.
DOER lets owners replace broken or damaged panels and keep earning SRECs, as long as the project stays the same size. The owner or the aggregator has to send DOER a change request within 30 days, or the project can lose that quarter's SRECs. Adding panels, raising capacity or replacing the whole project isn't allowed.
A Sale Doesn't Restart the Clock
The buyer gets whatever is left of the 40 quarters, and the paperwork goes through the Production Tracking System.
The state says the decision to transfer SRECs in a property sale is up to the buyer and seller. To move them, the current aggregator files a change request in the Production Tracking System, with a REC services agreement and documents showing the transfer. DOER recommends filing by May 1, August 1, November 1 or February 1, depending on the quarter.
Your Options
1. Keep It and Run It Well
Best when: the project is producing well, the roof under it has years left if it's on one, and someone on your team will report production, sell the certificates and answer the state's emails.
2. Fix It
Best when: output has dropped and a repair would bring it back before the term runs out. Check whether your commercial solar project is working before you spend money.
3. Sell It
Best when: the SREC IIs are ending and running the project is no longer worth your time. That includes projects already earning Class I RECs; we buy those too. See how buyers work out what an old commercial solar project is worth. Missing paperwork rarely stops a sale: see how to sell a solar project without the paperwork. For more on older projects in the state, see our Massachusetts commercial solar page.
Sitting on a commercial solar project you'd rather not deal with? Do Good Energy buys them, working or not, in NJ, NY, MA, MD, VT, PA and DC. Get a number in 23 seconds.
Own an existing commercial solar system in Massachusetts? Our Massachusetts solar guide covers sREC-I, SREC-II or SMART, and what happens when they end.
More questions? The solar guide answers the ones every owner has, state by state.
Ready to Discuss Your Project?
Get your instant estimate or talk to our team about your legacy solar project.